Resource planning system for project design organizations

Plan team capacity and track project costs in one system

HRP calculates how many people you need for a project and whether you will profit on it — based on building area and industry standards.

Deterministic calculation, not a black box

90%
Less time on resource planning
100%
Accurate project cost calculation
2h
Instead of 3–5 days on plan

Department workload · Sep–Dec

plan, % of standard
SepOctNovDec
Chief project engineer8595100110
Lead architect100120135110
Chief structural engineer9095100105
HVAC specialist708595100
Lead plumbing engineer80906560
BIM manager40558590
<50%50–75%75–95%100%110–120%overload
▲ Lead architect: 135% overload in November — schedule risk. Hire or reassign — visible a quarter ahead.

Implemented at a 50-person design firm · Questions are answered by developers, not a call center

Use cases

How teams start working with HRP

Three typical tasks — choose yours, we will show the solution at the demo.

Tender

Fee proposal calculation

Resource plan and project cost — in 2 hours, not a week. Enter the building parameters — HRP calculates hours by discipline, team composition and margin. Meet every proposal deadline.

Show on my project
Margin

Project margin control

Each project margin — in real time, not in the annual report. HRP collects cost from actual payroll and timesheets and shows where a project goes into the red, while it can still be fixed.

Show on my portfolio
Hiring

Hiring planning

Who to hire in 3 months — by numbers, not feelings. HRP sums workload across all projects considering vacations and shows deficit by specialty for months ahead.

Show forecast
Challenges

Pain points of project organization managers

What prevents controlling the business of an architecture or engineering firm and making data-driven decisions

No complete picture of team workload

The manager does not see the real utilization of engineers and architects in one window. Spreadsheets become outdated faster than they are updated.

Project profitability is unknown

It is impossible to accurately calculate project profitability without labor cost data from payroll systems and real rate accounting.

Manual planning takes days

Creating a resource plan for a new project requires 3–5 days of work by the project manager or planner — but the proposal deadline will not wait.

No workforce demand forecast

With portfolio growth, it is impossible to predict how many engineers, architects or specialists need to be hired in the coming months.

Solution

A Russian system for project and resource management

HRP replaces spreadsheets and manual calculations where MS Project is overkill. A tool for decisions based on objective data on projects, workload and economics.

Algorithm · standards

Calculates the plan itself

Need for specialists and hours is calculated from building area and standards, not entered manually. What takes a lead architect 3–5 days, HRP does in hours.

Deadlines shifted? Change the contract dates — plan, workload and money are recalculated instantly, not after a week of manual rework.

Knows the industry out of the box

Documentation sections, design stages, positions and starting standards are already in the system — you don’t start from zero or spend months configuring a generic tool. From the first closed contracts, the algorithm calibrates standards to your team.

Design / Working docsAR · SR · ES1–646 positionsman-hours/m²plan by role, not by day

Spots staffing gaps month to month

The Staff tab immediately shows who is overloaded and which specialists are missing for current projects. Rebalance, hire, reassign — the decision is visible right away.

Senior architectuncovered 7,359 h · recommend hiring by Aug 20
Predictive analytics + AI explanations

Finds bottlenecks on its own

Bottlenecks are found by math: overloads, staffing gaps, deviations — across five categories. AI explains each one: what happened and what to do.

Critical: senior architect overload — risk of missed deadlines. The insight explains which work and hours caused the overload.
Predictive analytics

Forecasts workload ahead

A mathematical forecast based on the burn rate draws the cost curve "plan / actual" 3–12 months ahead — overrun or savings are visible months before the report.

Algorithm · facts from accounting reports

Money: plan and actual in one window

You upload standard accounting reports — the system builds the contract, estimated cost, actual payroll and margin per company and per project. No changes to your accounting system required.

Actual payroll is 39% below estimate — margin and cost per m² visible for every project.

Launch in 1–2 weeks

Works from the browser, no platform or extra licenses. Training takes 2–3 hours, transparent subscription pricing instead of a license bundle and an implementation project.

browser-basedno extra licenses2–3h trainingcustom changes — weeks, not quarterstransparent pricingimplementation included — no integrators
How it works

HRP implementation in a design firm in 1–2 weeks

Simple process from setting up directories to getting the complete picture of team utilization and project economics

1

Setting up directories

Positions and rates, man-hour standards per 10,000 m², production calendar, vacation and sick leave — we set up the database for your organization once.

2

Loading projects and contracts

Structure: project → building → contract with parameters and deadlines. The system automatically calculates the need for engineers for each discipline.

3

Automatic resource allocation

Algorithm distributes employees across contracts considering vacations, skills and current workload. Project managers see who is free and who is overloaded.

4

Plan/fact control and analytics

Dashboard shows plan/fact, deviations, workload, project cost and margin. Make decisions based on numbers, not feelings.

Pricing

Flexible plans for your team. All terms are negotiable.

Starter
Contact us
up to 20 users
  • Up to 20 users
  • Basic resource planning
  • Employee time tracking
  • Basic analytics
  • Email support
Enterprise
Contact us
50+ users
  • Unlimited users
  • Full system functionality
  • Custom configuration
  • Dedicated account manager
  • 24/7 priority support
  • Staff training

Note: All plans include system setup, training and support. Contact us for a custom quote based on your team size and requirements.

Frequently asked questions

The "Professional" plan — up to 35 users. If you grow to 36+ within a year, you move to Enterprise without reinstalling or losing data.

Instead of "try it yourself" — we give you a free demo on your own data: we calculate the plan and cost for one of your typical contracts. It is more revealing than a sandbox interface.

The system is flexible and customizable to your process. At the demo we discuss your specifics: contract types, document structure, rates — all configurable. For complex business processes custom development is available — we will discuss it separately.

Once a month you export three standard reports from 1C:Payroll and upload them to HRP. The system matches employees automatically, calculates the full payroll cost (with taxes and contributions) and the actual cost of each project — including overhead and general expenses. The contribution rate and overhead structure are configurable to your accounting policy. Data is never silently overwritten: re-uploading a period requires an explicit decision. No connectors or custom 1C development are needed; there is an API and a Telegram timesheet bot for the rest. Need a direct integration — let’s discuss it at the demo.

The core numbers — plan, hours, cost — are calculated by a deterministic algorithm based on standards; AI does not take part in this calculation. The AI advisor works on top: it explains deviations and suggests standard adjustments — every suggestion comes with a rationale for the data behind it. You apply changes: no number changes without human confirmation (or an autopilot mode you explicitly enable, with an audit log).

During rollout we fill in the reference tables together with you. After that the system suggests standard adjustments based on actual data — you confirm with a click or enable autopilot mode. A real example: a client reviewed the first auto-corrections once, confirmed the quality, and enabled autopilot — after that standards update without human involvement, and every change is logged in the audit log.

Nothing beyond the subscription. Implementation and training are included; no integrators, separate contracts or software markups are needed — the rollout is run by the product team in 1–2 weeks.

More questions? Message us on Telegram or open the full list — 20+ more questions and answers

Demo

Ready to see the complete business picture?

Book a free demonstration and get an economic effect calculation.

You can decide later — we will discuss it during the demo

Thank you! We will get in touch with you shortly.
Something went wrong. Please try again.

We will show on your data

We will calculate the plan and cost for one of your typical projects — compare with how it is organized now.

Book demo on your data

Demo access to test database

Leave your name and email — we will create personal demo access. Login and password will be shown immediately.